Bob Hope Patriotic Hall
The renovation of the historic 1926 Patriotic Hall resulted in a transformed multipurpose facility that features meeting and conference spaces, a full basement, and a 663-seat auditorium. Scope of work included bringing the facility up to code, installing new MEP and HVAC systems, and introducing features in compliance with ADA.
Preserving the historic nature of the building included protecting and restoring several interior murals. The murals in the dining room, Navy room, and main entrance were covered in protective plastic sheeting during construction, while those on the sixth floor were demounted and stored, then remounted after rehabilitation.
​
AJK installed power and lighting, fire alarm system, voice/data, audio-visual system, and security system.Â
Location
Los Angeles, CA
​
Build Partners
PCL Construction
Nadel Architects
​
Size
85,000-sq. ft.
​​​
Delivery Method
Design-Build